Civil Engineering Case Studies  |  Concrete Structures Case Studies

Case Studies and Projects

Woodberry Down- Phase 1

Infrastructure and housing project comprising of a bulk earthworks cut and fill operation, 278 works, and Plot works including an extensive amount of retaining wall works. Woodmace Ltd undertook the Principal contractor role during the initial infrastructure works circa £1.5m. Difficult ground conditions were overcome by dealing effectively with ground water to ensure the project success.


Groundworks being carried out on Woodberry Down
A road being built for Woodberry Down


  • Client - Bloor Homes
  • Location – Lyme Regis
  • Value - £2.8m to date (project ongoing)
Drainage system at Woodberry Down


无码中文有码中文人妻中文,在线高清视频不卡无码,人妻互换中文字幕电影